Pipelining

4″ Sanitary Sewer in Grand Rapids
The Waste Recovery team was contacted by a local Ford Dealer with a bad offset joint blocking nearly all flow to a 4-inch sanitary sewer pipe. The Waste Recovery team has
June 23, 2021
1:43 pm

Pipelining

Neglected Sewer Line Finally Getting an Upgrade
Improvements on sewer lines are now underway in Kirkland. More than 3,050 feet of stormwater infrastructure are getting upgrades due to their deteriorating status. City contractors will renovate the degraded stormwater
June 10, 2021
8:17 pm